01Neodymium magnets
High-temperature neodymium magnets: H, SH, UH and EH grades explained
Read article →
Date
27 October 2026
Category
Author
GUK Magnetics
Welcome to the GUK Magnetics November Market Update. As year-end approaches, attention is turning to stock requirements for early 2027. New made-to-order requirements travelling by sea freight should now be planned for delivery during 2027, with availability confirmed against production schedules, any licensing requirements and the booked freight service.
For existing orders, we are working with our production facilities and forwarders to confirm production progress, shipment dates and expected UK arrival. Where stock is needed for a particular production date, please discuss this with us early so we can review the available options.
China has extended the suspension of the wider export controls announced in October 2025. A notice published on 9 November confirms that the specified measures remain suspended from 11 November 2026 until 10 January 2027.
The extension does not remove the April 2025 controls affecting samarium cobalt magnets and neodymium products containing controlled rare-earth materials such as dysprosium or terbium. Licensing requirements should continue to be confirmed against the actual composition of the product.
For affected orders, production completion, licence approval and a booked departure remain separate milestones. Completing end-user documentation early and agreeing the required freight method before submission will help avoid unnecessary changes later in the process.
Where suitable for your application, we may be able to provide an independently verified alternative grade free from controlled heavy rare-earth materials. Please contact us to discuss whether this is an option for your requirements. Any alternative must still meet the operating-temperature, coercivity and magnetic-performance requirements of your design.
Learn which magnet grades are affected, how the export licence process works and the potential impact on lead times.
View Export Licence GuidanceThe latest completed monthly data, covering October, showed global air cargo demand increasing by 6% year on year while capacity remained broadly flat. Demand continued to grow, although there were few signs of an exceptional late peak-season surge. Conditions vary between routes, so global figures do not indicate the space available for an individual China–UK shipment.
For urgent orders, we would confirm the routing, available space and applicable fuel surcharges with our forwarders. Collection, export clearance and airline acceptance also need to be allowed for when assessing the earliest realistic delivery date
Winter weather is becoming a more significant consideration for ocean freight, with disruption to vessel schedules, berth availability and terminal operations across North Europe, including pressure at some UK gateways.
Selected services are returning to the Suez Canal, although further changes remain dependent on conditions in the Red Sea. Routing and transit times therefore need to be checked for the individual booked service.
For delivery-critical orders, we would confirm the vessel schedule, routing and port cut-off with our forwarders. We would also suggest allowing appropriate contingency between the expected arrival date and the date the stock is required for production, particularly around Christmas and New Year.

October’s commodity figures showed a mixed picture. Cobalt fell by approximately 18% compared with September, while aluminium and zinc increased. Copper and nickel eased, and neodymium and samarium remained unchanged at US$135.00/kg and US$18.50/kg respectively.
Our interactive Commodity Price Tracker lets you explore historical prices, compare materials and view monthly changes in one place. Raw-material movements do not translate directly into equivalent changes in finished-magnet prices, which also depend on the grade, manufacturing requirements and order quantity.
Explore the Commodity Price Tracker
The immediate priority is to review outstanding deliveries and confirm stock requirements for the first part of 2027. Production schedules, export approvals and freight availability should be considered together when establishing realistic delivery dates.
If you have repeat orders or upcoming stock requirements, please get in touch with GUK Magnetics. We can review what you need and work through the production and freight timings with you, giving you a realistic indication of when the stock can be available.
Speak to our team about the material, grade, coating and configuration for your application, or review upcoming orders, export licence documentation, delivery requirements and stockholding.
Discuss Your RequirementsPrefer to speak to us? Call +44 (0) 2890 271 001.
Crafted By Rapid